About Ahwaa New Site
Ahwaa New Site is a rural community in the Kwabere East area of the Ashanti Region. The community faces challenges in accessing safe and clean drinking water, which affects both household health and livestock. This project aims to address these needs and improve the overall well-being and livelihoods of the residents.
Borehole Technical Specifications
- Borehole Depth: 45 meters
- Pump Type: Hand pump
- Water Quality Test:Conducted by Ghana Water Company Limited (GWCL) to ensure the water meets national drinking water standards.
- Livestock Trough:A dedicated trough to provide water for animals, covering the needs of both humans and livestock
Expected Benefits:
- Provides safe drinking water for the community
- Supports health improvement for residents
- Ensures water availability for livestock, enhancing livelihoods
- Contributes to sustainable access to water in the Ahwaa New Site community.